Battery Wharf

J. Derenzo Co. & Boston Environmental team on high profile waterfront project

J. Derenzo Co. and Boston Environmental worked with Skanska USA Building on this $230 million Battery Wharf mixed-use project. Battery Wharf includes four buildings housing a 150-room luxury hotel and 104 residences along with restaurants, a spa and parking facilities. All work was performed on a very constricted site with little staging area within an active portion of the Boston waterfront.

J. Derenzo Co. performed all earth support, excavation and utility work, including over 1,200 linear feet of steel sheeting earth support.

Boston Environmental managed the mass excavation of over 72,000 tons of contaminated soils. Boston Environmental removed, transported and disposed these soils in both lined and unlined landfills. The soils management by Boston Environmental included treatment of lead-impacted soils using the patented FESI-BondTM process and removal of hazardous waste from the site.

Previous ProjectBarry's Corner
Next ProjectBoston Landing